Project Management Board 85 and Road Management Area IV opened the Long Thành interchange at 18:00 on May 24, 2026. This connection links the TP.HCM – Long Thành – Dầu Giây expressway with the Biên Hòa – Vũng Tàu expressway, allowing vehicles from central TP.HCM to travel directly toward Vũng Tàu.
Eliminating the 18km Detour to Võ Nguyên Giáp
Access Restrictions and Route Workarounds

- Exit the expressway onto National Highway 51.
- Navigate the roundabout to re-enter the TP.HCM – Long Thành – Dầu Giây expressway in the opposite direction.
- Use the newly opened T2 branch to finally enter the Biên Hòa – Vũng Tàu expressway.
VEC’s Temporary Toll Strategy
The 17.8 Trillion VND Investment in Regional Connectivity

| Inactive Connection Route | Status |
|---|---|
| Dầu Giây ↔ Biên Hòa | Under Construction |
| TP.HCM ↔ Biên Hòa | Under Construction |
| Dầu Giây → Vũng Tàu | Under Construction |









