archytele The Vault
Episode guide

S16·E6 The Acton House - 6

Core Aired February 28, 1994
Advertisement

Synopsis

The framing crew continues working on the addition; a large steel beam to carry out the upper floor is lowered into place. A framer demonstrates a pneumatic tool for attaching metal hangers to wood. The guys lay down the second floor deck, using construction adhesive and tongue and groove plywood. Inside, we find Terry Maitland putting in a footing for the missing basement lally column. We then meet a lead paint inspector, who uses an x-ray machine to gauge the presence and concentration of lead paint in the old building. Tom Silva works on replacing the rotten and underframed back of the old building. We meet a lightning protection inspector from Underwriters Labs, who assesses the building's system.

Rate this episode

Your rating is anonymous and can be changed later.

Be the first viewer to rate it.

Advertisement

Frequently Asked Questions

When did Season 16 Episode 6 of This Old House air?

Season 16, Episode 6 ('The Acton House - 6') originally aired on February 28, 1994.

How long is Season 16 Episode 6 ('The Acton House - 6')?

The episode follows the standard broadcast runtime for This Old House.

What happens in This Old House Season 16 Episode 6?

The framing crew continues working on the addition; a large steel beam to carry out the upper floor is lowered into place. A framer demonstrates a pneumatic tool for attaching metal hangers to wood. The guys lay down the second floor deck, using construction adhesive and tongue and groove plywood. I...

What viewers say

No comments yet. Be the first to share your take on This Old House S16E6.

Advertisement