archytele The Vault
Episode guide

S7·E10 UK Super Train

Episode
Season 7, Episode 10
Air Date
January 19, 2010
Runtime
60 minutes
Story Type
Core Character Arc
Core Aired January 19, 2010 60 min
Advertisement

Synopsis

It's one of the biggest construction projects in British engineering history. A new high-speed rail line costing several billion pounds and cutting through some of the most heavily developed land on the planet to complete a high speed link between two of Europe's major capitals: the Channel Tunnel between London and Paris. High Speed One's design and construction overcame unprecedented obstacles to achieve what many thought was impossible. Step aboard to explore the engineering behind this UK super train line.

Rate this episode

Your rating is anonymous and can be changed later.

Be the first viewer to rate it.

Advertisement
Advertisement

Frequently Asked Questions

When did Season 7 Episode 10 of MegaStructures air?

Season 7, Episode 10 ('UK Super Train') originally aired on January 19, 2010.

How long is Season 7 Episode 10 ('UK Super Train')?

The runtime for this episode is approximately 60 minutes.

What happens in MegaStructures Season 7 Episode 10?

It's one of the biggest construction projects in British engineering history. A new high-speed rail line costing several billion pounds and cutting through some of the most heavily developed land on the planet to complete a high speed link between two of Europe's major capitals: the Channel Tunnel b...

What viewers say

No comments yet. Be the first to share your take on MegaStructures S7E10.

Advertisement