archytele The Vault
Episode guide

S2·E8 Prefinished Engineered Floor; Replacing a Sink Stopper

Aired November 27, 2003

Synopsis

Replacing wall-to-wall carpeting with pre-finished hardwood flooring; pros and cons of floors; replacing a rusty bathroom sink stopper.

Rate this episode

Your rating is anonymous and can be changed later.

Be the first viewer to rate it.

Advertisement